Kāpiti Aquatic Centre

About the project

Kāpiti Aquatic Centre

Kāpiti Coast District Council have built a new Aquatic Centre to cater for the growing population in the region. We have worked with Aquaheat on this project alongside Aurecon as the Consulting Engineer, supplying both our Insultherm pipework and Dynatherm PP-RCT pipe system for the heating and chilled water mains.

UPG were able to offer pre-fabricated header manifolds and also Insultherm Elbows with extended legs and other pre-fabricated sections, providing Aquaheat with valuable time and labour savings, and minimising risk with less welds in the ground on-site. This project was finished in 2013.

Project Partners

Installer: Aquaheat
Developer: Kāpiti Coast District Council
Architect: ASC Architects
Consulting Engineer: Aurecon Group
Consulting Engineer: LHT Design

Completion Date
2013
Services
Mechanical Services
Sector
HVAC & Mechanical
Systems Employed
stream-pe100-pressure-logo (1)
dynatherm-logo (1)

Other HVAC & Mechanical projects

Other projects

Have a question?

Call 0800 473 100

sales@upg.net.nz