Wellington Hospital have recently replaced some cooling towers and as part of this, UPG have been engaged to supply our STREAM PE100 pipe system. The contractor used the STREAM PE100 pipe system instead of traditional Stainless Steel pipework, taking advantage of cost savings and the install labour savings that goes with using STREAM PE100 pipework. Being 100% UV resistant, this pipework is perfect for outdoor installations for the Cooling Tower connections on the Hospital roof, as it doesn’t require any painting or protection.