Graeme Lowe Tannery

About the project

Graeme Lowe Tannery

This project involved a few hundred metres of Stream PE100, Dynatherm and Insultherm piping for various services, including: cold water, hot water (85°C), warm water (50°C), effluent waste and sulphuric acid transfer.

Our fabrication for this project included 120 metres of 400mm flanged pipe lengths and 60 metres of 315mm flanged pipe lengths for the effluent waste mains, with pre-fabricated 100mm PE100 manifolds connecting to a series of offtakes every 6 metres along the main discharge lines. PE100 was chosen ahead of stainless steel to replace the original PVC due to its ability to withstand harsh chemicals and UPG’s ability to supply a large bore pre-fabricated and cost effective solution.

The Insultherm pre-insulated pipe system was used for the underground transfer of cold, warm & hot water between the pumphouse and the main plant.

Project Partners

Asset Owner & Installer: Lowe Corporation

Completion Date
2013
Services
Chemical / Water / Waste Transfer
Sector
Industrial
Systems Employed
stream-pe100-pressure-logo
dynatherm-logo
insultherm-logo

Other Industrial projects

Other projects

Have a question?

Call 0800 473 100

sales@upg.net.nz