Hutt City Council Building

About the project

Hutt City Council Building

On this project, a geothermal piped system has been installed using our Stream PE100 system. This had over 7 km of 32mmOD pipework installed including drop sections strapped to the 18 metre deep piles installed on site. All pipe runs lead back to the plantroom where UPG have fabricated headers in PP-RCT with 178 off takes to accommodate all the pipework. Impressive stuff!

We also supplied the Dynatherm PP-RCT system for the potable hot and cold plumbing for the Lower Hutt City Council Building alongside the Town Hall project. Sizes ranged from 25mm to 75mm for the main cold water runs. Stream PE100 also used for the firemains and watermain feeding the site sizes between 90mm and 180mm.

Project Partners

Developer: Hutt City Council
Project Manager: RDT Pacific
Architect: Architecture Plus
Consulting Engineers: Stephenson & Turner
Contractor: Naylor Love
Installer: Virtual Plumbing

Completion Date
2016
Services
Geothermal Pipework
Sector
Civil and Infrastructure
Systems Employed
stream-pe100-pressure-logo (1)
dynatherm-logo (1)

Other Civil and Infrastructure projects

Other projects

Have a question?

Call 0800 473 100

sales@upg.net.nz